Short Load PNW β€” Pacific Northwest's Premier Volumetric Fleet | Since 1998
Delivering on Our Word Since 1998

Precision-Batched Concrete.
Mixed On Your Site.

The Pacific Northwest's premier volumetric fleet. Fresh concrete batched to exact specifications at the point of pour. 27 years of doing exactly what we say we're going to do.

Ironclad Dispatch Reliability
DOT-Approved Mixes
I-5 Corridor Coverage
πŸ“

Project Estimator

Volume & cost β€” calculated live

pnl
in
ft
ft
ft
ft
in
Live Estimate
Total Volume Required
0.00ydΒ³
Volume per Panel0.00 ydΒ³
Total Panels1
ZERO HOT-LOAD RISK. On-site volumetric mix eliminates transit curing. DOT High-Early compliant.
Estimated Total
$0
Concrete Volume0.00 ydΒ³
Materials ($247/yd)$0
Base Delivery$200
Fuel Charge$25
Estimated Total$0
Estimate based on selected PSI mix. Includes $25 fuel charge. Surcharges: Night (5PM–6AM) +$1,000 Β· Saturday +$150 Β· Sunday +$500 Β· Standby $5/min Β· Out of Area (Gresham/Hillsboro +$85, Others +$130) Β· No Pour Cancellation $200.

The Volumetric Advantage

Barrel trucks start curing the second they load. Our volumetric fleet batches fresh concrete on your site β€” to your exact spec, at point of pour. No guesswork. No waste.

01

Zero Transit Curing

Concrete is batched the moment you're ready to pour. No 90-minute drum life. No rejected loads. No delays cascading through your schedule.

02

Exact Yardage, Every Load

Pay for what you pour. Volumetric metering delivers precision to the quarter-yard. No over-ordering "just in case," no short loads that stall your crew.

03

Any Mix, Any Specification

High-early, fiber-reinforced, DOT-approved structural mixes β€” dialed in on-site. Real-time adjustments at point of pour, not back at a batch plant.

04

Multi-Pour, One Truck

Three different mix designs on the same job? One truck handles it all. Eliminate the logistics headache of coordinating multiple barrel deliveries across your site.

05

Full I-5 Corridor Reach

California border to Canadian border. Major infrastructure, remote sites, urban cores β€” we go where the project is. Reliable dispatch, consistent service.

06

27 Years. Zero Shortcuts.

Continuously operating since 1998. We've poured through every condition the Pacific Northwest can deliver. When we commit to a time, we hold to it. Your timeline is safe with us.

Ready to Talk Specs?

Direct line to our dispatch team. Specs, scheduling, fleet availability β€” one call gets it done.

Call 503-925-1002

Transparent Pricing. No Surprises.

We publish our rates because we respect your time. Flat $200 delivery fee plus $25 fuel charge plus a per-yard material rate. No hidden fees. What you see is what you pay.

Select Mix Design
Yards OrderedPer-Yard Rate (4000 PSI)Delivery FeeTotal Estimate

Additional Surcharges

β›½
Fuel Charge$25 flat β€” all deliveries
πŸŒ™
Night Delivery (5PM–6AM)+$1,000 flat fee
πŸ“…
Saturday Delivery+$150
πŸ“…
Sunday Delivery+$500
⏱️
Standby Time$5/min after 10 min per yard
πŸ“
Gresham / Hillsboro+$85 out-of-area fee
πŸ“
Other Out-of-Area+$130 delivery surcharge
🚫
No Pour / Cancellation$200 penalty

All pricing reflects 2026 standard rates. Specialty mixes, fiber, accelerants, and color additives quoted separately. Call for details.